AT WORK | 2018 | Dam 5-D

Project Img
Project Img

Dam 5-D Dam Raising

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. Structure 5-D required raising the top of Dam 1', to ensure the Dam will safely pass the required storm event.

Project Img
Project Img

Dam 5-D Spillway Improvement

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. ODNR required the armoring of the grassed Auxillary Spillway, to ensure the Dam will safely pass the required storm event.

Dam 5-D Dam Raising

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. Each of the eight Dams were designed by the USDA – Soil Conservation Service, to the standards in place at the time of construction in the 1970s. As standards improve, each dam is evaluated and modified as needed to meet the stricter standards in place today. Structure 5-D required raising the top of Dam about 1 foot, to ensure the Dam will safely pass the required storm event. This work was performed by MWCD staff.

Location

Dam 5-D
Read more
Dam 5-D