Dam spillways and mechanisms must be kept clear of debris and be repaired and maintained to function at maximum efficiency.
Dam spillways and mechanisms must be kept clear of debris and be repaired and maintained to function at maximum efficiency.
Maintenance of the flood control system consists of two parts:
Dam spillways and mechanisms must be kept clear of debris and be repaired and maintained to be able to function at maximum efficiency.
In 1997, an engineering study of the project estimated that $309,000 per year would provide needed maintenance on the channels and dams and return the project to its original condition, allowing it to provide the basic flood control protection for which it was designed. A current engineering estimate has increased that need to $350,000 per year.
Your property assessment is essential to maintaining this system of flood control for our community. By providing adequate funding to maintain the system, we are able to take a proactive role in the maintenance of our shared investment.
For more detail on maintenance, visit the AT WORK section.