AT WORK | 2017 | Dam III-A

Dam II-A Improvement
Dam II-A Improvement

Dam II-A Improvement

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. Structure II-A required raising the top of Dam about 1 foot, to ensure the Dam will safely pass the required storm events.

Dam III-A Drainage

ODNR - Dam Safety directed Chippewa Subdistrict to address a wet area at the outside toe of the dam. It was determined that a drain tile would be adequate to dry out this low area. 1670 feet of 6-inch drain tile was installed. 760 feet of old fencing was removed to facilitate the project and will be replaced with maintenance-friendly high-tensile fence.