Summary of maintenance and special projects completed in 2016.
Summary of maintenance and special projects completed in 2016.
Five Pipe Structures were replaced, and two improved, between Coal Bank and Black Diamond Rds.
New gate and fencing restricts access to areas that suffered from illegal access, damage and dumping.
Original fencing and gates at Dam IV-A were in poor condition. All flood control dams are fenced to limit access by livestock and off road vehicles...
Eight Chippewa Dams are mowed at least 3 times annually. Debris must be removed from trash racks. Brush control is needed periodically.
Vegetation management is key to preserving channel capacity for flow, and providing access for removal of log and debris jams...
In the 40 years since the project was constructed, many trees have grown to a size and condition that they became a problem....
In 2016, MWCD staff began field investigations of the foundation drains of Chippewa dams.
Eight Chippewa Dams are mowed at least 3 times annually. Debris must be removed from trash racks. Brush control is needed periodically.