At Work | 2015
Summary of maintenance and special projects completed in 2015.
Summary of maintenance and special projects completed in 2015.
Not all of the access berm areas are located in wooded or rural areas. Some properties are a residential and require more careful restoration after maintenance...
Four decayed pipe structures were replaced between St. Rt. 585 and Porr Road.
Eight pipe structures were replaced with new high density polyethylene (HDPE) pipe that meet the current rigorous standards.
Chippewa Creek Reach CC12 RB required that three structures be replaced.
The top of the dam access lane and trail at Hubbard Valley Park was replaced with a durable limestone surface.
Security gates were added at multiple locations to prevent unauthorized access to protected areas and private property.
Limestone Trail replacement.
The top of the dam is a popular trail at Hubbard Valley Park. Worn sod needed to be replaced with a durable limestone surface and compacted to provide a stable and uniform walking surface for visitors all ages.