Dam 5-D Dam Raising

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. Structure 5-D required raising the top of Dam 1', to ensure the Dam will safely pass the required storm event.

Project Img
Project Img

Dam 5-D Spillway Improvement

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. ODNR required the armoring of the grassed Auxillary Spillway, to ensure the Dam will safely pass the required storm event.

Dam 5-D Spillway Improvement

All Chippewa flood control dams are regulated by the State of Ohio – ODNR – Dam Safety. In order to meet the standards in place today, ODNR required the armoring of the grassed Auxillary Spillway, to ensure the Dam will safely pass the required storm event. Approximately 3000 square yards of Turf Reinforcement matting was installed. Tucson Inc. from New Philadelphia, Ohio was the Contractor for this project.