Projects 2017
Dam VII-C Instrumentation


In 2017, we installed our first Automated Rainfall and Stage Level Monitoring System with a StormLink Satellite Monitoring Station. MWCD staff installed conduit and a concrete base in preparation for the project.  The solar-powered station was installed and will be serviced by One Rain Inc. We will be able to monitor the site remotely, for rainfall and flood pool stage, which is especially important during large storm events.


 

Above: Chippewa Dam VII-C




s