Projects 2016

Chippewa Creek Reach
CC04 LB Structure Replacement


Five Pipe Structures were replaced, and two improved, between Coal Bank and Black Diamond Rds.

 

 

Above: Structure 35L

Original galvanized corrugated metal pipe has completely deteriorated and was collapsing, at a channel maintenance access point.  The pipe has been removed and recycled.