Projects 2015
Limestone Trail
| Limestone Delivery

Project: Access Lane and Trail at  Hubbard Valley Dam.

The top of the dam is a popular trail at Hubbard Valley Park. Worn sod needed to be replaced with a durable limestone surface.

 

 




Delivery of over 800 tons of limestone was required to construct the 6-inch deep access lane and trail.