Projects 2007
Structure 3
L Pipe Replacement

Little Chippewa Creek structure 3L had rusted out to the point where the banks had eroded back to the asphalt driveway often used by Morton Salt.

Photo above shows the construction crew removing Structure 3L in preparation for new N-12 pipe.




This photo shows the gravel bedding and first section of N-12 pipe installed.